BREEAM Indoor pollutants VOCs
Contents |
[edit] Aim and benefits
The aim of this issue is to improve indoor air quality for building occupants through the specification of materials to internal spaces with low VOC content.
VOCs (Volatile Organic Compounds) are substances that have a high vapour pressure at room temperature. In effect, this means they are released in to the air from materials without having to heat them.
VOCs can be human made, or naturally occuring and not all VOCs are harmful to human health. Most smells/odours are VOCs including smells from plants used to communicate. However, many VOCs are harmful to human health, and while typically not imminently toxic in the concentrations likely come across, there is significant evidence that they have a compound effect over time on human health. Issues can range from experiencing sick building syndrome, to increases in chances of leukemia.
VOC concentrations can be up to 1000 times higher indoors than outdoors (although likely five times higher), and with significant time being spent indoors by a large proportion of the population, this presents a problem. The concentrations of VOCs are frequently higher in new build/refurbishments.
By reducing VOC content in materials used in the building, the benefit to occupants of the building is a more pleasant working environment (VOCs smell!), and reduced impact on their health.
[edit] When to consider
It is important for the success of the credit to ensure early engagement is undertaken by the Design Team. The Assessor should ideally get the architect to complete a specification document confirming that the initially specified finishes (i.e. paints, varnishes, wood panels) meet the BREEAM compliance in line with Table 20.
In addition, where "Equal and approved" products are acceptable, the specific standards required by the product should be included in the architectural specification.
The second point at which this credit need be considered is when letting packages to sub contractors. The requirements of the credit need to be clearly stated in the sub contractors tender pack and then contract so that they are fully aware of the products that need to be used. There is frequently (although not always) a small cost uplift in using low VOC products.
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
Awaiting content
[edit] Tools and resources
Awaiting content
[edit] Tips and best practice
Awaiting content
[edit] Typical evidence
Awaiting content
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- List applicable schemes here
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
[edit] Related articles on Designing Buildings Wiki
- Air filtration and clean Indoor air quality standards.
- Air quality.
- At a glance - Indoor air quality.
- BREEAM and air quality.
- BREEAM Indoor air quality plan.
- BREEAM Indoor air quality Ventilation.
- Clean indoor air for healthy living - New air filter standards.
- Ensuring good indoor air quality in buildings.
- GREENGUARD Certification.
- Health effects of indoor air quality on children and young people.
- Indoor air quality.
- Indoor environmental quality.
- Volatile Organic Compounds.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
























